What is the FAS Drainage Standard?
It is the five rules Florida Aqua Solutions (FAS) designs drainage to. One: sized to a 25-year storm from NOAA Atlas 14. Two: fall measured on site before design, at least 1%, about 1/8 inch per foot, from inlet to outlet. Three: pipe chosen for the fall the ground actually has. Four: Florida licence CBC1269202, with civil engineers on projects that need extra assurance. Five: field checks plus Water MRI before anything goes in the ground.
What is a 25-year storm in Orlando?
A 25-year storm is rain heavy enough to come about once every 25 years on average, about a 4% chance in any year. In Orlando that is 7.53 inches of rain in 24 hours and 3.34 inches in one hour, from NOAA Atlas 14.
How much fall does a drain pipe need?
FAS designs for at least 1% of fall, about 1/8 inch per foot, from inlet to outlet. A 4-inch corrugated line needs about 2% of fall to carry silt out. Smooth-wall pipe does the same job on about a quarter to a third of that.
What should I ask a drainage contractor before I hire one?
Ask three questions: what storm is it sized for, what fall did you measure, and what is your licence number. The FAS answers are a 25-year storm from NOAA Atlas 14, fall measured on site before design with at least 1% from inlet to outlet, and Florida licence CBC1269202.